Project Name: RFX#2181800051 Client: DEWA Contractor: Yukon Scope of work: Design, Supply, Installation, Testing & Commissioning of new fire & Gas Detection System for the new Chlorine Dioxide Skid Enclosure at M Station year 2019.
Gas Turbine FA&FD Works
Project Name: DEWA Gas Turbine Overhauling Works Client: DEWA Contractor: Siemens FF Contractor: Yukon Scope of work: SUPPLY AND INSTALLATION OF EXISTING FIRE ALARM DEVICES AND CABLING AT DEWA GAS TURBINE UNIT (M22) – DEWA M STATION
Fuel Oil Tank – H Station
Project Name: RFX#2121800044 Client: DEWA Contractor: Yukon Scope of work: Improvement in Fire Fighting System of the Fuel Oil Storage Tanks in H Station and associated electromechanical works and interfacing with the existing system – Al Aweer, Dubai.
Fuel Oil Tank – D Station
Project Name: RFX#2121800148 Client: DEWA Contractor: Yukon Scope of work: Engineering, supply, installation, required integration with existing systems and plants, testing and commissioning of entire system consisting of SS316L pipes, deluge valves, pressure switches, flow switch, solenoid valves, manual isolation valves, fire detection systems, cables, electrical/control panels, breakers, push buttons and relay wirings and other […]
DEWA Electrical Works
Project Name: RFX#2421900122 Client: DEWA Contractor: Yukon Scope of work: Supply, Installation, Testing and Commissioning of Electrical Systems such as open to sky Substation, LV container and Electrical upgradation works for DEWA MBR solar park Research and Development (R&D) Center – Al Qudra, Dubai.
Fuel Oil Storage Tank
Project Name: RFX#2191700030 Client: DEWA Contractor: Yukon Scope of work: Engineering, supply, installation, testing and commissioning of fire detection and fire fighting system in D station Phase II – for 4 no’s of fuel oil storage tanks and 3 no’s of fuel oil storage day tanks.
AMC Booster Pumping Stations
Project Name: RFX#2121600083 Client: DEWA Contractor: Yukon Scope of work: Annual maintenance contract for maintenance of pumps and valves in booster pumping stations (Najma Phase – 1,2,3,4; Jebel Ali Habab Phase – 1,2,3; Hatta Phase – 1, 2, 3; DIP – 1, 2; Emirates, Nad Al Sheeba & Mushrif Pumping Stations).
Solar Structure and Panel
Project Name: Solar Structure and Panel Client: FEWA Contractor: Yukon Scope of work: Design, fabrication, supply and installation of the solar panel structure.
Fire Detection System
Project Name: RFX#2191600004 Client: DEWA Contractor: Yukon Scope of work: Design, supply, installation, testing & commissioning of new fire detection system in the fuel oil supply area of auxiliary boiler #50 & #60 and interface with the existing fire detection system.
Re-Circulation Pumps
RFX 2121400025 Client: DEWA MEP Contractor: Yukon Re-Circulation Pumps Installation Replacement of existing 8 (eight) no’s of recirculation pump-motor units along with guide tube, electrical cable, motor management unit and accessories at Mushrif Reservoir Phase I. The above works are completed.